Installing Optional Components; Installing Antiseismic Kits - Huawei UPS5000-E-400K Series User Manual

60 kva power modules
Table of Contents

Advertisement

UPS5000-E-(400 kVA-600 kVA)
User Manual (60 kVA Power Modules)

3.2.3 Installing Optional Components

3.2.3.1 Installing Antiseismic Kits

Install antiseismic kits only when the cabinet is ground-mounted.
Step 1 Mark mounting holes on the ground based on the marking-off templates.
Figure 3-13 Dimensions of antiseismic kit mounting holes for the 400 kVA UPS and 500 kVA
UPS (unit: mm)
Figure 3-14 Dimensions of antiseismic kit mounting holes for the 600 kVA UPS (unit: mm)
Step 2 Drill holes for installing expansion bolts, and install expansion sleeve.
Issue 05 (2019-12-24)
Copyright © Huawei Technologies Co., Ltd.
3 Installation
63

Advertisement

Table of Contents
loading

Table of Contents