Installing Optional Components; Installing Antiseismic Kits - Huawei UPS5000-S-300 kVA User Manual

3p3w, 200 v
Table of Contents

Advertisement

UPS5000-S-300 kVA User Manual
(3P3W, 200 V)

3.2.2 Installing Optional Components

3.2.2.1 Installing Antiseismic Kits

Context
Install antiseismic kits only when the cabinet is ground-mounted.
Procedure
Step 1 Mark mounting holes on the ground based on the marking-off templates.
Figure 3-10 Dimensions of antiseismic kit mounting holes (unit: mm)
Step 2 Drill holes for installing expansion bolts, and install expansion sleeve.
Step 3 Open the front door of the cabinet and remove the support baffle plates from the front of the
cabinet. Remove the rear cover.
Issue 01 (2020-03-06)
Copyright © Huawei Technologies Co., Ltd.
3 Installation
53

Advertisement

Table of Contents
loading

Table of Contents