Chapter 3: Installing the Avaya G350 Media Gateway

This chapter describes the physical installation of the G350. Perform the following steps in the
order in which they are listed:

Step 1: Mount the G350 chassis

Step 2: Install the media modules
Note:
The required media modules are usually pre-installed in the G350 chassis. If this
Note:
is the case, skip this step. Read this section only if the media modules are not
pre-installed, or if you want to replace modules or add new media modules.
Step 3: Attach ground conductors
Step 4: Connect power to the G350
When you have installed the chassis and media modules, and connected the power, you can
move on to
Chapter 4: Connecting
Step 1: Mount the G350 chassis
Mount the G350 in one of the following ways:
In a rack
On a wall
On a table
!
CAUTION:
When handling any components of an S8300 Media Server or G350 Media
CAUTION:
Gateway, wear an anti-static wrist ground strap. Connect the strap to an
approved ground, such as an unpainted metal surface.
Note:
Avaya has developed special hardware platforms for customers with harsh
Note:
environmental conditions. These platforms have been tested to meet stringent
physical and environmental requirements (i.e., shock, vibration, EMI, etc.)
imposed by the United States Navy for use on their ships. The platforms make
use of specialized racks and reinforcements. If you wish to obtain information
about the design and implementation of such a ruggedized solution, contact the
Avaya Navy Shipboard Services organization.
on page 29
on page 34
on page 40
on page 44
devices, and connect external devices to the G350.