Installing The Ecm Extended Subrack - Huawei UPS5000-A-400 kVA User Manual

50 kva, pf 0.9
Hide thumbs Also See for UPS5000-A-400 kVA:
Table of Contents

Advertisement

UPS5000-A-400 kVA
User Manual (50 kVA, PF=0.9)

3.2.3.3 Installing the ECM Extended Subrack

Procedure
Step 1 Remove the filler panel from the optional card slot, as shown in
Figure 3-31 Removing a filler panel
Step 2 Install the ECM extended subrack, and secure it by using the removed screws, as shown in
Figure
Figure 3-32 Securing an ECM extended subrack
Issue 03 (2020-01-10)
Store the remove panel screws for securing the ECM expansion subrack.
3-32.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
Figure
3-31.
66

Advertisement

Table of Contents
loading

Table of Contents