User Manual (50 kVA, PF=0.9)
Figure 3-19 Expansion bolt
(1) Bolt
Knock the expansion bolts into the holes until the expansion tubes completely fit into the
holes. The expansion tubes must be completely buried under the ground to facilitate
subsequent installation.
Figure 3-20 Installing expansion bolts (unit: mm)
1.
Issue 03 (2020-01-10)
(2) Spring washer
Drill holes in the ground by using a hammer drill. The hole depth is 52 mm to 60 mm.
Copyright © Huawei Technologies Co., Ltd.
(3) Flat washer
3 Installation
(4) Expansion tube