UPS5000-A-400 kVA
User Manual (50 kVA, PF=0.9)
(1) Battery
cables
Bind signal cables and power cables separately.
Step 3 Route signal cables. Remove the small cover from the cabinet top, as shown in
Bind cables to the cabinet.
cabinet.
Issue 03 (2020-01-10)
Figure 3-38 Routing power cables from the top of the cabinet
(2) Bypass input power
cables
Figure 3-39
Copyright © Huawei Technologies Co., Ltd.
(3) Output power
cables
shows the signal cables routed from the top of the
3 Installation
(4) Mains input power
cables
Figure
3-37.