To Connect The Refrigerant Piping To The Outdoor Unit - Daikin Altherma 3 R F Installer's Reference Manual

Hide thumbs Also See for Altherma 3 R F:
Table of Contents

Advertisement

7
|
Piping installation
To open/close the stop valve
To handle the stem cap
To handle the service cap

7.3.8 To connect the refrigerant piping to the outdoor unit

Installer reference guide
76
1 Remove the stop valve cover.
2 Insert a hexagon wrench (liquid side: 4  mm, gas side: 4  mm) into the valve
stem and turn the valve stem:
Counterclockwise to open
Clockwise to close
3 When the stop valve CANNOT be turned any further, stop turning.
4 Install the stop valve cover.
Result: The valve is now open/closed.
The stem cap is sealed where indicated with the arrow. Do NOT damage it.
After handling the stop valve, tighten the stem cap, and check for refrigerant
leaks.
Item
Stem cap, liquid side
Stem cap, gas side
ALWAYS use a charge hose equipped with a valve depressor pin, since the service
port is a Schrader type valve.
After handling the service port, tighten the service port cap, and check for
refrigerant leaks.
Item
Service port cap
Piping length. Keep field piping as short as possible.
Piping protection. Protect the field piping against physical damage.
1 Connect the liquid refrigerant connection from the indoor unit to the liquid
stop valve of the outdoor unit.
Tightening torque (N∙m)
14.2~17.2
22~28
Tightening torque (N∙m)
11~14
ERLA03DAV3 + EHFH03S18DJ3V
Daikin Altherma 3 R F
4P596806-1 – 2019.10

Advertisement

Table of Contents
loading

Table of Contents