Commissioning; Overview: Commissioning; Precautions When Commissioning - Daikin Altherma 3 R F Installer's Reference Manual

Hide thumbs Also See for Altherma 3 R F:
Table of Contents

Advertisement

10
|

Commissioning

10 Commissioning
In this chapter

10.1 Overview: Commissioning

10.2 Precautions when commissioning

Installer reference guide
154
INFORMATION
Protective functions – "Installer-on-site mode". The software is equipped with
protective functions, such as room antifrost. The unit automatically runs these
functions when necessary. (If the user interface home pages are off, the unit will not
operate automatically.)
During installation or service this behaviour is undesired. Therefore, the protective
functions can be disabled:
At first power-on: The protective functions are disabled by default. After 36  h
they will be automatically enabled.
Afterwards: An installer can manually disable the protective functions by setting
[A.6.D]: Disable protections=On. After his work is done, he can enable the
protective functions by setting [A.6.D]: Disable protections=OFF.
10.1
Overview: Commissioning ...................................................................................................................................................... 154
10.2
Precautions when commissioning.......................................................................................................................................... 154
10.3
Checklist before commissioning............................................................................................................................................. 155
10.4
Checklist during commissioning ............................................................................................................................................. 156
10.4.1
To check the minimum flow rate........................................................................................................................... 156
10.4.2
Air purge function .................................................................................................................................................. 156
10.4.3
To perform a test run............................................................................................................................................. 158
10.4.4
To perform an actuator test run............................................................................................................................ 158
10.4.5
Underfloor heating screed dryout ......................................................................................................................... 158
This chapter describes what you have to do and know to commission the system
after it is installed and configured.
Typical workflow
Commissioning typically consists of the following stages:
1
Checking the "Checklist before commissioning".
2
Performing an air purge.
3
Performing a test run for the system.
4
If necessary, performing a test run for one or more actuators.
5
If necessary, performing an underfloor heating screed dryout.
INFORMATION
During the first running period of the unit, the required power may be higher than
stated on the nameplate of the unit. This phenomenon is caused by the compressor,
that needs a continuous run time of 50 hours before reaching smooth operation and
stable power consumption.
NOTICE
ALWAYS operate the unit with thermistors and/or pressure sensors/switches. If NOT,
burning of the compressor might be the result.
ERLA03DAV3 + EHFH03S18DJ3V
Daikin Altherma 3 R F
4P596806-1 – 2019.10