Installation Site Requirements Of The Indoor Unit - Daikin Altherma 3 R F Installer's Reference Manual

Hide thumbs Also See for Altherma 3 R F:
Table of Contents

Advertisement

6
|
Unit installation

6.1.3 Installation site requirements of the indoor unit

Installer reference guide
52
INFORMATION
Also read the precautions and requirements in the "General safety precautions"
chapter.
The indoor unit is designed for indoor installation only and for the following
ambient temperatures:
-
Space heating operation: 5~30°C
-
Space cooling operation: 5~35°C (only in combination with kit EKHVCONV3)
-
Domestic hot water production: 5~35°C
Mind the following measurements guidelines:
Maximum refrigerant piping length between indoor unit and
outdoor unit
Minimum refrigerant piping length between indoor unit and
outdoor unit
Maximum height difference between indoor unit and outdoor
unit
Mind the following spacing installation guidelines:
≥500
INFORMATION
If you have limited installation space, do the following before installing the unit in its
final position:
remove one or both side panels.
The foundation must be strong enough to bear the weight of the unit. Take the
weight of the unit with a domestic hot water tank full of water into account.
Make sure, in the event of a water leak, water cannot cause any damage to the
installation space and surroundings.
Do NOT install the unit in places such as:
In places where a mineral oil mist, spray or vapour may be present in the
atmosphere. Plastic parts may deteriorate and fall off or cause water leakage.
Sound sensitive areas (e.g. near a bedroom), so that the operation noise will
cause no trouble.
In places with high humidity (max. RH=85%), for example a bathroom.
In places where frost is possible. Ambient temperature around the indoor unit
must be >5°C.
≥600
(mm)
"6.4.4  To connect the drain hose to the drain" 
20 m
3 m
20 m
4
[
  61]. It requires to
ERLA03DAV3 + EHFH03S18DJ3V
Daikin Altherma 3 R F
4P596806-1 – 2019.10

Advertisement

Table of Contents
loading

Table of Contents