To Connect The Refrigerant Piping To The Outdoor Unit - Daikin Sky Air Active Series Installer's Reference Manual

Hide thumbs Also See for Sky Air Active Series:
Table of Contents

Advertisement

To handle the stem cap
To handle the service cap

7.2.8 To connect the refrigerant piping to the outdoor unit

AZAS100~140MUV/Y
Sky Air Active-series
4P743509-1 – 2023.08
Counterclockwise to open
Clockwise to close
3 When the stop valve CANNOT be turned any further, stop turning.
4 Install the stop valve cover.
Result: The valve is now open/closed.
The stem cap is sealed where indicated with the arrow. Do NOT damage it.
After handling the stop valve, tighten the stem cap, and check for refrigerant
leaks.
Item
Stem cap, liquid side
Stem cap, gas side
ALWAYS use a charge hose equipped with a valve depressor pin, since the service
port is a Schrader type valve.
After handling the service port, tighten the service port cap, and check for
refrigerant leaks.
Item
Service port cap
Keep the following in mind:
Piping length. Keep field piping as short as possible.
Piping protection. Protect the field piping against physical damage.
You can route the refrigerant piping to the front, bottom, side or rear of the unit.
a
b
a Front connection
b Bottom connection
c Side connection
7
|
Tightening torque (N∙m)
13.5~16.5
22.5~27.5
Tightening torque (N∙m)
11.5~13.9
d
c
Piping installation
Installer reference guide
39

Advertisement

Table of Contents
loading

Table of Contents