Commissioning

22 Commissioning
In this chapter

22.1 Overview: Commissioning

22.2 Precautions when commissioning

Installer and user reference guide
146
CAUTION
See
"3  Specific installer safety
complies with all safety regulations.
NOTICE
General commissioning checklist. Next to the commissioning instructions in this
chapter, a general commissioning checklist is also available on the Daikin Business
Portal (authentication required).
The general commissioning checklist is complementary to the instructions in this
chapter and can be used as a guideline and reporting template during commissioning
and hand-over to the user.
22.1
Overview: Commissioning ...................................................................................................................................................... 146
22.2
Precautions when commissioning.......................................................................................................................................... 146
22.3
Checklist before commissioning............................................................................................................................................. 147
22.4
Checklist during commissioning ............................................................................................................................................. 148
22.5
About the SV unit test run...................................................................................................................................................... 149
22.6
About the system test run...................................................................................................................................................... 149
22.6.1
To perform a test run............................................................................................................................................. 149
22.6.2
Correcting after abnormal completion of the test run ......................................................................................... 150
22.7
To perform a SV/indoor unit connection check..................................................................................................................... 151
22.8
Operating the unit .................................................................................................................................................................. 153
After installation and once the field settings are defined, the installer is obliged to
verify correct operation. Therefore a test run MUST be performed according to the
procedures described below.
This chapter describes what you have to do and know to commission the system
after it is configured.
Commissioning typically consists of the following stages:
1
Checking the "Checklist before commissioning".
2
Performing a test run.
3
If necessary, correcting errors after abnormal completion of the test run.
4
Operating the system.
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
4
instructions"  [
  14] to make sure commissioning
RXYSA8~12AMY1B
VRV 5-S system air conditioner
4P752782-1A – 2024.02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrv 5Rxysa8amy1bRxysa10amy1bRxysa12amy1b

Table of Contents