Unpacking Steps; Rack Or Cabinet Hardware Installation; Rack Mount Safety Considerations; Readyrails Installation - Dell EMC S5232F-ON Installation Manual

Hide thumbs Also See for S5232F-ON:
Table of Contents

Advertisement

Safety and Regulatory Information
Warranty and Support Information

Unpacking Steps

Unpack the system carefully.
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Carefully remove the switch from the container and place it on a secure and clean surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.

Rack or cabinet hardware installation

You may either place the switch on a rack shelf or mount the switch directly into a 19" wide, EIA-310- E-compliant rack. Rack mounting
includes four-post, two-post, or threaded mounts. The ReadyRails system is provided for 1U front-rack and two-post installations.
The ReadyRails system includes separately packaged rail assemblies.
WARNING:
This document is a condensed reference. Read the safety instructions in your
information booklet before you begin.
NOTE:
The illustrations in this document are not intended to represent a specific switch.
NOTE:
Do not the use the mounted ReadyRails as a shelf or a workplace.

Rack mount safety considerations

Rack loading—Overloading or uneven loading of racks may result in shelf or rack failure, possibly damaging the equipment and causing
personal injury. Stabilize racks in a permanent location before loading begins. Mount the components starting at the bottom of the rack,
then work to the top. Do not exceed your rack's load rating.
Power considerations—Connect only to the power source specified on the unit. When you install multiple electrical components in a
rack, ensure that the total component power ratings do not exceed the circuit capabilities. Overloaded power sources and extension
cords present fire and shock hazards.
Elevated ambient temperature—If installed in a closed rack assembly, the operating temperature of the rack environment may be
greater than the room ambient temperature. Use care not to exceed the 45°C (113°F) maximum ambient temperature of the switch.
Reduced air flow—Install the equipment in the rack so that the amount of airflow required for safe operation of the equipment is not
compromised.
Reliable earthing—Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than
the direct connections to the branch circuit, for example, use of power strips.
Do not mount the equipment with the back panel facing downward.

ReadyRails installation

For the S5248F-ON and S5232F-ON switches, you can install the ReadyRails system using the 1U tool-less square-hole method or one of
three possible 1U threaded round-hole methods. The tooled installation methods include two-post flush mount, two-post center mount, or
four-post threaded mount.
NOTE:
Do not use the ReadyRails system for the S5296F-ON switch. For the S5296F-ON switch installation instructions, see
S5296F-ON four-post rack
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
24
S5200F-ON Series switch installation
assembly.