Installing The N2000H V3 On Holding Rails - Huawei N2000H V3 User Manual

Table of Contents

Advertisement

N2000H V3 Appliance
User Guide
3.
----End
Follow-up Procedure
Connect the power cable to the Appliance and power on the N2000H V3. Connect the
network cable, video graphics array (VGA) cable, and USB device to the Appliance.

2.3.3 Installing the N2000H V3 on Holding Rails

Context
Holding rails apply to the rack where the distance between the front and rear mounting bars is
609 mm to 914 mm.
Procedure
Step 1 Install the front end and rear end of the holding rail.
1.
2.
3.
4.
Issue 04 (2018-11-06)
Figure 2-10 Installing the N2000H V3
When the two mounting ears on the N2000H V3 contact the mounting bars on the rack,
tighten the captive screws on the mounting ears to secure the N2000H V3.
Hold down the plate on the front end of the holding rail, and pull out the hook. See steps
(1) and (2) in
Figure
2-11.
Insert the positioning pins on the rear end of the holding rail into the square holes in the
rack. See step (3) in
Figure
Align the front end of the holding rail with the hole in the column, and push the holding
rail forward to insert it into the hole in the column. See step (4) in
Push the hook backwards to make the metal sheet close to the column. See step (5) in
Figure
2-11.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Installing and Removing the N2000H V3
2-11.
Figure
2-11.
39

Advertisement

Table of Contents
loading

Table of Contents