Taylor C708 Operator's Manual page 40

Heat treatment soft serve freezers
Hide thumbs Also See for C708:
Table of Contents

Advertisement

OPERATING PROCEDURES
If the blades are in good condition, place the rear
scraper blade over the rear holding pin on the beater.
(See Figure 6-4.)
6
Note: Scraper blades should be replaced every
3 months.
Note: The hole on the scraper blade must fit
securely over the pin to prevent costly damage.
7. Holding the rear blade on the beater, slide it into the
freezing cylinder halfway. Install the front scraper
blade over the front holding pin. (See Figure 6-5.)
6-2
Figure 6-3
Figure 6-4
Figure 6-5
8. Before installing the beater shoes, check the shoes
11529
for any nicks, cracks, or signs of wear. If any defects
are present, replace the beater shoes.
9. If the beater shoes are in good condition, install the
beater shoes. (See Figure 6-6.)
11534
10. Slide the beater assembly the rest of the way into the
freezing cylinder.
Make sure the beater assembly is in position over the
driveshaft by turning the beater slightly until the
beater is properly seated. When in position, the
beater will not protrude beyond the front of the freez-
ing cylinder. (See Figure 6-7.)
11531
Repeat steps 1 through 10 for the other side of the
Model C716.
Models C708 & C716
Figure 6-6
Figure 6-7
Operating Procedures
11531
11533

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C716

Table of Contents