Saw Band Dismantling; Saw Band Installation - Bomar Individual Automatic Series Operating Instructions Manual

Hide thumbs Also See for Individual Automatic Series:
Table of Contents

Advertisement

4.1.

Saw band dismantling

1.
Lift the saw arm to maximum position.
2.
STOP hydraulic.
3.
Open all three covers on the saw arm.
4.
Dismantle left protective cover of the band (arrow). Cover is fastened by screws..
5.
Release the screw holding the brush. Turn the brush to the side
6.
Turn by stretching star to the left side, release saw band stretching and pull down
the saw band from the wheels.
7.
Pull down the band from the wheels.
8.
Pull up the saw band from the guiding cubes.
4.2.

Saw band installation

1.
Prior to installation, clean all track wheels, guide cubes and inner side of the arm
thoroughly of all traces of chips and dirt. Keep in mind the teeth direction when
installing the saw band.
2.
Insert new saw band in the guide cubes. Make sure the saw band runs between
both guide rollers and it is pushed all the way to the top.
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Individual 620.460 ganc

Table of Contents