Interface for
locking systems
I
EN
54
Initial commissioning
All devices are connected to the Hi-O Technology™ for the initial commissioning,
but are not configured yet. If the voltage supply is switched on, the system is in
plug and play mode and the devices work with the factory settings.
Interfaces for locking systems cannot work with factory settings, because they must
be logically linked to the corresponding Emergency Open push-buttons. The
configuration must be completely finished before the Interfaces for locking systems
can be commissioned.
Any changes which are made necessitate re-configuration
(D01104xx ePED
®
Service Software Manual).
Commissioning
Note!
Set-up: All Hi-O devices must be connected to the bus for the configuration. Then
the operating voltage is switched on. Subsequently connected devices are only
recognised after renewed connection of the operating voltage.
At least one Emergency Open module is always necessary for operation of the
RWT locking module.
1
Configure the system via the ePED
®
(D01104xx ePED
®
Service Software
Service Software Manual).
Set-up operation
Need help?
Do you have a question about the ePED 1386-00 and is the answer not in the manual?
Questions and answers