Abbott ARCHITECT RHS Training Manual page 148

Retest sample handler
Table of Contents

Advertisement

MODULE 5: MISCELLANEOUS
NOTE: This will be located after c8000 RSH installation procedure.
(Continued)
5-16
FOR INTERNAL USE ONLY
Hang Sample Handler on i2000
Install STAT and Sample RSH Aspiration Covers
Fully seat Sample Handler
Tighten Mounting Clamps
Loosen
System Mounting Clamps
i2000
SR
Prepare Connection Pins
Install Mounting/Alignment pins sets on i2000
Insert top opening Mounting/Alignment pins c8000
Insert lower Mounting/Alignment pins c8000
Install screws to mount center brace
Route Bar Code and Keypad (LUI) cables
Connect i2000
and c8000 System Module Sample Handlers
SR
Verify seam between Sample Handler Sections
Tighten Six Set Screws
Verify Bearing surface
Verify level Sample Probes
Adjust i2000
System level
SR
Secure Sample Handler to i2000
Install Center Support Brace on Sample Handler
Connect Front Center Core Support Bracket
Connect Rear Structure Interface Bracket to c8000 System
Connect N540 Keypad/Bar Code Cable
Route Carrier Transport Belt
Attach Carrier Transport Belt
Attach Belt Tension
Install Carrier Transport
®
Install WS72 ci8200
System Integrated Flex Cable
Install Priority Light Sensors and Unit Detect Boards
Install Light Panel Access Covers
Install Interlock Sensor Boards
Install c8000 System Carrier Positioner cables
Install c8000 System Carrier Positioner Sensor cable will into SIB J7 Module 1
Install WS82 c8000 and WS83 i2000
Secure right ground strap to Sample Handler
Connect RSH Signal Interface Board (SIB) cables
Connect Sample Handler Motor Drive cables
Install left and right rear covers
Install rear center closeout
Install Processing Module Rear Top Cover
Install Processing Module Front Top Cover
Install Top Cover Center Bar
Processing Module
®
SR
System
SR
®
System
®
System
System Processing Module
SR
System Carrier Positioner Motor cables
SR
®
ARCHITECT
RSH Service Training Guide
201532-102

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents