PLANNED MAINTENANCE

The Planned Maintenance Checklist can be located in the ARCHITECT Service and Support Manual,
Planned Maintenance Section. It contains suggestions for planned and as needed maintenance. Any
deviation or change from these suggestions due to or based on local, country, or area operating procedures
and business needs must be documented and approved locally.
NOTE: A translated, locally approved, copy of this checklist may be provided by the
The PM has been divided into intervals. The intervals are time-based dependent on the analyzer
installation date.
PM Procedures for the RSH are incorporated into the Processing Module PMs and/or outlined in the ISA
Database. The following RSH procedures are contained in the c8000
procedures:
P-169 Clean Filter RSH Card Cage Filters
Verify smoked doors are closing properly
M&D 6311 RSH Cleaning
Inspect and Lubricate RSH
Lubricate Pulley
-
M&D 1119 Transport Calibration
-
M&D 3222 RSH Bar Code Calibration
-
M&D 1111 & 1117 Pipettor Calibrations
PM: Planned Maintenance
Consists of procedures designed to maintain the performance of the system
Quarterly from analyzer installation date/anniversary
Annually from analyzer installation date/ anniversary
Monthly from analyzer installation date/anniversary
®
ARCHITECT
RSH System Service Training Guide
201532-102
local service area/country organization.
Time Period
MODULE 5: MISCELLANEOUS
®
System or i2000
®
System PM
SR
PM Procedure
PM #B
PM #C
PM #D
FOR INTERNAL USE ONLY
5-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents