Installation; Installation Procedure; Entire Unit Installation; Dip Switch Configurations - JCM GLOBAL DBV Series Integration Manual

Hide thumbs Also See for DBV Series:
Table of Contents

Advertisement

3 INSTALLATION

This section provides installation and operating
instructions for the DBV-400 Banknote Validator
unit. The information within this section contains
the following features:

• Installation Procedure

• DIP Switch Configuration
Installation Procedure
The DBV-400 Frame Unit provides installation
holes for each surface.
E
U
I
NTIRE
NIT
NSTALLATION
Perform the following steps to install the DBV-400
Unit:
1. Place the DBV-400 Unit Frame cut outs
(See Figure 5
a
through
1
Thread Studs chassis.
2. Secure the rear side of the DBV-400 Frame to the
chassis with six (6) nuts.
NOTE: Refer to "Unit Dimensions" on
page 35 for each Bezel's dimensions.
a
1
a
3
b
b
1
2

Figure 5 Thread Studs Location

P/N 960-000175R_Rev. A {EDP #233426}
®
DBV
Series Banknote Validator (DBV-400) Integration Guide
a
b
b
) on to the
4
and
1 &
2
Chassis Side
Reference Dimensions
a
2
Insertion Slot
Area (Open)
a
4
50.8
84

DIP Switch Configurations

This section provides the denomination DIP Switch
Block 1 (DS1) and Block 2 (DS2) Settings for the
DBV-400 Unit.

Table 8 DIP Switch Block 1 Settings

Switch
Switch ON
No.
1
VEND 1 INHIBIT
2
VEND 2 INHIBIT
3
VEND 3 INHIBIT
4
VEND 4 INHIBIT
5
VEND 5 INHIBIT
6
VEND 6 INHIBIT
7
VEND 7 INHIBIT
8
TEST MODE

Table 9 DIP Switch Block 2 Settings

Switch
Switch ON
No.
1
OFF
2
OFF
3
OFF
4
OFF
5
OFF
6
OFF
7
OFF
8
OFF
© 2014, JAPAN CASH MACHINE CO., LTD.
8
DS1 DS1
Switch OFF
VEND 1 ACCEPT
VEND 2 ACCEPT
VEND 3 ACCEPT
VEND 4 ACCEPT
VEND 5 ACCEPT
VEND 6 ACCEPT
VEND 7 ACCEPT
FUNCTION
DS2
Switch OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dbv-400

Table of Contents