Step 2 Install the server.
1.
Issue 04 (2020-01-16)
Figure 5-10 Installing the front and rear ends of a holding rail
Insert the positioning pins on the rear of the rail into the square holes in the
cabinet. See (3) in
Figure
Align the front with a square hole, and push the holding rail forward until it
snaps into place. See (4) in
Push the hook backwards so that its metal sheet touches the mounting bar.
See (5) in
Figure
5-10.
(Optional) Install an M6 screw in the third square hole at the rear of the
holding rail to secure it. See (6) in
Install the other holding rail in the same way.
Pull out the inner rails as far as they will go. See
Copyright © Huawei Technologies Co., Ltd.
5-10.
Figure
5-10.
Figure
5-10.
5 Install and Configure
Figure
5-11.
51