Huawei TaiShan 200 Series User Manual page 54

Table of Contents

Advertisement

TaiShan 200 Server
User Guide (Model 2280)
Step 2 Install the L-shaped guide rails.
1.
2.
3.
Step 3 Install the server.
1.
2.
Issue 04 (2020-01-16)
Position a guide rail horizontally in contact with the mounting bars in the
cabinet.
Tighten the screws to secure the guide rail. See
Figure 5-6 Installing an L-shaped guide rail
Install the other guide rail in the same way.
Lift the server. This task requires at least two people.
Place the server on the guide rails and slide it into the cabinet. See (1) in
Figure
5-7.
Copyright © Huawei Technologies Co., Ltd.
5 Install and Configure
Figure
5-6.
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Taishan 2280

Table of Contents