Electrical Requirements; Assembling The Biooptix 10; System Space Requirements - Teledyne 10 Installation And Operation Manual

Teledyne isco, inc. installation and operation guide switch
Table of Contents

Advertisement

BioOptix™ 10
Section 2 Installation
= Keep area clear for instrument
connections, ventilation and to
access On/Off Switch.
56 cm
Figure 2-1 System space requirements
2.2.2 Electrical
Requirements
2.2.3 Assembling the
BioOptix 10
2-2
To keep tubing length at a minimum, buffer, sample, and waste
collection containers should be placed to the left of the unit. The
containers may also be kept behind the unit as long as the con-
tainers are accessible.
The Foxy 200 should be installed to the right of the BioOptix 10.
The fraction collector requires about 1800 square centimeters
2
(275 in
) of bench space. Ensure that the full motion of the
fraction collector arm is not obstructed.
The Windows PC may be placed anywhere within 2 meters of the
BioOptix 10 unit (the length of the serial control cable).
100 cm
16 cm
8 cm
33 cm
13 cm
(Front)
10 cm
44 cm
10 cm
The operating voltage of the BioOptix 10 is factory set. Refer to
the serial number label on the right side panel to determine the

electrical requirements.

Teledyne Isco recommends that the BioOptix 10 system runs on
a dedicated AC circuit to prevent abnormal conditions that may
be caused by high current or electrical noise. The BioOptix 10
and Foxy 200 should be connected to the same circuit to prevent
ground loop anomalies.
The BioOptix 10 is shipped in two pieces—a column module and
a pump module. After unpacking and inspecting the modules
place them as shown in Figure 2-2 on a sturdy work surface. This
will allow access to the internal electrical and fluid connections.
(Rear)
Foxy 200
BioOptix
12 cm
29 cm
50 cm
16 cm
8 cm
61 cm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Biooptix 10

Table of Contents