1
Remove the cap nut from the metallic cable connector and remove
the plastic insert and seal ring.
2
Strip the outer cover from approx. 10 mm of the cable.
3
Slide the cap nut 1, seal ring 2 and plastic insert 3 over the cable 4.
1
4
Bend the shield braid 5 outward and fold it back over the plastic
insert 3.
5
Push the cable into the intermediate opening 6 in the metallic cable
connector until the braid touches the opening and then push it in and
out several times.
6
Push the non-rotating plastic insert 3 and seal ring 2 in the inter-
mediate opening 6 until it engages.
7
Securely tighten the cap nut 1.
8
Connect the data transmission and 24-VDC connection cable leads
according to their respective numbers to terminals 1 to 12 and 13 to 15
(see connection diagram, page 17).
Step
Action
1
Remove the cap nut on the threaded connector and remove both seal
rings.
2
Slide the cap nut 1 and seal rings over the cable.
6-8 mm OD Cable: Use seal rings 2 and 3.
8-12 mm OD Cable: Use seal ring 2 only.
3
Pass the cable through the intermediate openings 4 in the connection
box.
4
Tighten cap nut 1 (torque to 2.5 Nm).