Power Supply Connection - ABB EL6010 Operator's Manual

Continuous gas analyzers
Table of Contents

Advertisement

Power Supply Connection

Connecting the
Power Supply to the
Control Unit
Analyzer Unit
Power Supply
20
Step
Action
1
Make sure that the power line voltage is in the permissible range
85 to 250 VAC.
2
Make sure the power supply leads have an adequately dimensioned
protective device (max. 6 A breaker).
Power consumption:
EL6010-CU + EL6010-Uras14
EL6010-CU + EL6010-Magnos106
EL6010-CU + EL6010-Caldos17
3
Install a breaker in the power supply line or a switched receptacle near
the control unit to make sure the control unit can be completely sepa-
rated from the power source. Mark the breaker so that its relationship
to the protected device is clear.
4
Connect the power supply leads (conductor cross-section = 1.5 to
2
2.5 mm
) to the terminals N, L and PE (see connection diagram,
page 17).
The analyzer unit is supplied with 24 VDC ± 5 % from the control unit's power
supply.
EL6010 Gas Analyzer in Category 2G Operator's Manual
approx. 100 VA
approx. 90 VA
approx. 40 VA
42/24-30 EN Rev. 1

Advertisement

Table of Contents
loading

Table of Contents