Instructions For Use - Otto Bock 4R84 Instructions For Use Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 9
► Take suitable measures if required (e. g. cleaning, repair, replacement,
inspection by the manufacturer or a specialist workshop etc.).
► Inform the patient.
Signs of changes in or loss of functionality during use
Among other factors, changes in functionality can be indicated by an altered
gait pattern, a change in the positioning of the prosthetic components relat­
ive to each other and by the development of noises.
4 Scope of Delivery
The following single components and accessories are included in the scope
of delivery in the specified quantities and are available for reordering accord­
ing to their respective symbols as single components ( ), single compon­
ents with minimum order quantities ( ) or single-component packs ( ):
Fig.
Item
1
5 Preparation for Use
CAUTION
Incorrect alignment or assembly
Injuries due to fall resulting from damaged prosthesis components
► Observe the alignment and assembly instructions.
CAUTION
Improper assembly of the screw connections
Fall due to breakage or loosening of the screw connections
► Clean the threads before every installation.
► Apply the specified installation torque values.
► Observe the instructions for securing the screw connections and the
use of the correct length.
5.1 Installation in the modular prosthesis
The pyramid adapter is fixed with the set screws of the pyramid receiver.
12 | Ottobock
4R84 double adapter
Quantity
Designation
1(   )

Instructions for use

1(   )
Adapter
4( 
 )
Set screw
Reference num­
ber
647H41
506G3=M8x12-V

Advertisement

Table of Contents
loading

Table of Contents