2�3� Installing The Ups; 2�3�1� Tower Installation - Vertiv Liebert GXT5 Series Installer/User Manual

120 v input, 120 v output
Hide thumbs Also See for Liebert GXT5 Series:
Table of Contents

Advertisement

2.3. Installing the UPS
The UPS may be installed as a tower or in a rack, depending on available space and use considerations� Determine
the type of installation and follow the appropriate instructions� See
page�
NOTE: When installing the UPS or making input and output connections, comply with all relevant safety
codes and standards.
2.3.1. Tower Installation
To install the UPS as a tower:
1� Take the support bases out of the accessories box�
Figure 2-1 Support bases
NO.
DESCRIPTION
1
Support bases
2
Spacers with connectors
NOTE: Three spacers are shown here. However, the number of spacers varies depending on your UPS model and the number of
battery cabinets in your system.
2� If optional, Liebert® external battery cabinets will be connected, take out the spacers shipped with the battery
cabinet�
3� Connect the spacers and the support bases as shown in
one in the front and one in the rear�
4� Place the GXT5 and any battery cabinets on the 2 support bases�
12
Tower Installation
Figure 2-1
above� Each GXT5 requires 2 support bases,
or
Rack Installation
on next
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents