Site Ready Inspection Visit

Must meet all in section 1 and 2 plus these additions reviewed at the site ready visit.
The GE Healthcare project manager will review the site delivery process with you to determine how
to best transfer the equipment from the transportation truck to your room.
This site ready inspection will review and check these items:
14
Delivery information
Determine delivery route into the scan room
Determine if tilt dollies or riggers are required
Determine if elevators, doorways and hallways are adequate for delivery
Determine if floor protection is required
Determine if a tilt bed truck is required for ground delivery and ordered.
Regulatory Requirement
Room size meets the minimum requirements
Site print is present and accurately reflects the room size and layout.
No grounded walls are present in the regulatory clearance areas
All regulatory clearances space is met
Room meets all local codes
Manufacturer Requirements: As listed in section 2 - all requirements are met
Purchaser's Site Preparation Work: As listed in section 1 - all actions are completed
Chapter 1 - Introduction
B
S
E
, E
, E
RIGHT
PEED
LITE
DGE
XCEL
: P
-I
RE
NSTALLATION
Page 31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brightspeed edgeBrightspeed excel

Table of Contents