Section 2.0 Cooling Requirement; Altitude - GE BrightSpeed Elite Preinstallation Manual

Table of Contents

Advertisement

GE H
EALTHCARE
D
5141177-100, R
IRECTION
EVISION
Section 2.0
Cooling Requirement
Use
Table 5-1
scanner is required for gantry operation. Locate a wall air-conditioning vent at floor level beside and
behind gantry to meet both gantry cooling needs and provide patient comfort. Do not locate any
cooling vents directly above the gantry. Air returns above the gantry are recommended.
SYSTEM COMPONENT
1. Gantry recommended (See NOTE 1)
2. HPower Table / GT1700 Table
3. Power distribution unit
Recommended Scan Room Subtotal (see notes):
4. Operator's console w/ 1 IG, 2 monitors & SCSI Tower
MOD Drive (Option)
IG Node, each (Option)
Remote Monitor (Option)
DASM (Option)
Recommended Control Room Subtotal (w/o option):
System Total (Recommended)
(See NOTE 1)
Option: Advantage Windows
Option: UPS
ROOM TOTAL (SEE NOTE 2)
NOTE 1:With 75 scan rotations per patient:
NOTE 2:Cooling requirements do not include cooling for room lighting, personnel or non-CT
Table 5-1 Cooling Requirements (Worksheet)
Please refer to
requirements.
Section 3.0

Altitude

System operating altitude is from -492 ft. to 9842.5 ft. (-150 meters to 3000 meters).
14
to assist in cooling requirements planning. Over half the cooling used by your
Recommended BTU/hr. provides for up to six patients per hour. It is also needed
during calibration of the system.
equipment.
Figure
4-7, and
Figure 4-12
Chapter 5 - Environmental Conditions
B
S
E
, E
RIGHT
PEED
LITE
BTU/HR
18,766
682/1023
5,118
24,566/24,907
8,189
682
1,024
222
290
8,189
32,755/33,096
256
5,200
in
Chapter
4,
Section
6.0, for component air flow
, E
: P
-I
DGE
XCEL
RE
NSTALLATION
WATT
5,500
200/300
1,500
7,200/7,300
2,400
200
300
65
85
2,400
9,600/9,700
75
1,200
Page 99

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brightspeed edgeBrightspeed excel

Table of Contents