Power Switch Assembly Replacement; Tools Required; Removal Procedure; Replacement Procedure - Keysight Technologies E5061B Service Manual

Network analyzer
Hide thumbs Also See for E5061B:
Table of Contents

Advertisement

Replacement Procedure

Power Switch Assembly Replacement

Power Switch Assembly Replacement

Tools Required

Removal Procedure

Refer to
Step 1. Remove the Outer Cover as described in
page
Step 2. Remove the Front Panel as described in
page
Step 3. Remove the Touch Screen Control Board as described in
Control Board Replacement" on page
Step 4. Remove the front panel rear side cover as described in

Replacement" on page

Step 5. Disconnect the connector (item 1) of cable from the A52 Front Panel Interface
Board.
Step 6. Remove the two TORX T10 screws (item 2) fastening the Power Switch
Assembly.
Step 7. Remove the parts (item 3) of the Power Switch Assembly.
Replacement Procedure
Step 1. Reverse the order of the removal procedure.
Set a torque to 9 in-lb for torque driver when fasten the TORX T10 screws
(item 2).
92
torque screwdriver, T8, T15 and T20
torque screwdriver, T10 (set to 9 in-lb)
flat edge screwdriver
Figure 4-21
for this procedure.
55.
56.
90.
"Outer Cover Replacement" on
"Front Panel Replacement" on
"Touch Screen
89.
"Inverter Board
Keysight E5061B Network Analyzers

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents