Installing The Mpc Open Xp Into An I-Vu® Control System - Carrier MPC Open XP Series Installation And Startup Manual

Table of Contents

Advertisement

Wiring communication
1
Turn off the MPC Open XP's power.
2
Wire the TruVu™ ET Display's RS485 connector to the <ALCProduct>'s Rnet port, Gnd to Gnd, + to Rnet +, - to
Rnet - using 2-conductor 22 AWG wire with a maximum distance of 500 feet (152 meters).
NOTE Verify the <ALCProduct>'s Enhanced Access DIP switch is set to Off.
3
Turn on the MPC Open XP's power.
Installing the MPC Open XP into an i-Vu® Control System
You must complete the following procedures to successfully install your MPC Open XP into an i-Vu® Control
System. Use the Help in the referenced software for detailed descriptions of these procedures.
EquipmentBuilder or Snap
1
Use EquipmentBuilder or Snap to create control program(s) for your MPC Open XP.
2
If applicable, print the Sequence of Operation, which includes the points list.
NOTE You can create a points list under Reports in the i-Vu® application or Field Assistant after installing
your control program.
This Installation Guide
1
Prepare a wire list using the points list. Refer to Appendix A (page 34).
2
Use the wire list and the following installation procedures to install and wire I/O points to your MPC Open XP
and expanders, if applicable.
MPC Open XP
MPC Open XPIO48/816
Installation and Start-up Guide
25
Installing the MPC Open XP
CARRIER CORPORATION ©2019
All rights reserved

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mpc open xpio48Mpc open xpio816

Table of Contents