GE Datex-Ohmeda S/5 Series Technical Reference Manual page 252

Compact anesthesia monitor, compact critical care monitor
Table of Contents

Advertisement

Datex-Ohmeda S/5 Compact Anesthesia and Compact Critical Care Monitors
6.
Lift the Display Unit carefully from the side of the unit (Note that the Front Unit is
connected with flat cables to the Central Processing Board). Detach the two flat cables
from the CPB X7 and X5 connectors. Please note that the connectors are fragile; do not
bend them while disconnecting the cables.
7.
Lay the Display Unit carefully on the table.
NOTE:
disconnected.
34
.
Document no
M1144956-003
X7
X5
Display Unit F-CM(C)1 rev. 05
When reassembling the cover, remember to clamp the Network cable if

Advertisement

Table of Contents
loading

Table of Contents