Preventive Maintenance Schedule - Kodak X-Omat 270 RA PROCESSOR Service Manual

Hide thumbs Also See for X-Omat 270 RA PROCESSOR:
Table of Contents

Advertisement

SERVICE MANUAL

Preventive Maintenance Schedule

Part or Assembly
DETECTOR CROSSOVER
DEVELOPER/FIXER CROSSOVER
FIXER/WASH CROSSOVER
WASH RACK
DEVELOPER RACK
FIXER RACK
DRYER RACK
RACK BEARINGS, CHAINS, and DRIVE GEARS
Squareness of RACKS
DRYER AIR TUBES
DEVELOPER FILTER
REPLENISHMENT STRAINERS and FILTERS
Water Supply FILTER
DRAIN HOSES
Ventilation Exhaust
DRIVE MOTOR CHAIN
LEVEL SENSOR PROBES
SPRING SPADES on the LEVEL SENSOR PROBES
DEVELOPER PROCESSOR TANK
FIXER and WASH PROCESSOR TANKS
Calibration of the REPLENISHMENT PUMPS
DETECTOR SWITCHES
WATER RESERVOIR
I
= Inspect for condition and adjust or
install new parts, if necessary.
L
= Lubricate with recommended material.
R
= Replace, if necessary.
T
= Test and adjust, if necessary.
* The weekly preventive maintenance
procedures can be performed by either the
operator of the PROCESSOR or by the trained
service provider.
† Completion of the monthly preventive
maintenance procedures is recommended to
ensure the optimum reliability of the
PROCESSOR.
34
Monthly†
Weekly*
C
C
C
C
I,C
I,C
I,C
I
I
I,C
R
C
R
I,R
C
C
= Rinse and clean carefully and completely
using warm water and a soft synthetic
sponge.
C(1) = Clean with Kodak DEVELOPER
SYSTEM CLEANER AND
NEUTRALIZER.
C(2) = Clean with Kodak FIXER/WASH
SYSTEM CLEANER.
C(3) = Clean any corrosion from the SPRING
SPADES.
The 3 month schedule is a guideline for sites
adhering to the site specifications issued by
Kodak. Actual usage and site characteristics may
require shorter intervals between maintenance.
3 Month Schedule
C(2)
C(1)
C(2)
T
I,L
C
C(3)
C(1)
C(2)
T
T
May 1996 – SM3058-3

Advertisement