3.2. Preliminary work on site
•
This is basically the following:
♦
Study the set-up and position of the equipment according to the site's general lay-out.
♦
Prepare the holes in the floor according to the specifications in the installation plans. Make sure to drill
the holes with the diameter adapted to the expansible bolts provided as accessories.
FIXING BRACKET
EXPANSIBLE BOLT B15/30
♦
Preparation of the electrical power supply and control cabling according to the specifications in chapter
[2.9. General dimensions and installation plans (with cabling)].