3.2. Preliminary work on site

This is basically the following:
Study the set-up and position of the equipment according to the site's general lay-out.
Prepare the holes in the floor according to the specifications in the installation plans. Make sure to drill
the holes with the diameter adapted to the expansible bolts provided as accessories.
FIXING BRACKET
EXPANSIBLE BOLT B15/30
Preparation of the electrical power supply and control cabling according to the specifications in chapter
[2.9. General dimensions and installation plans (with cabling)].
 Automatic Systems PNG38X-A3_1-04-gb-02.doc
-/3413/000
(or equivalent)
10/12/01
Min. 55
p. 15/51

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PNG382 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Png381Png380

Table of Contents