Alpha ESS Storion-SMILE-T10 Installation Manual page 30

Energy storage system
Hide thumbs Also See for Storion-SMILE-T10:
Table of Contents

Advertisement

Your Smart Energy
Installation
Figure 32 Connection of AC cables
Step 22: Please remove the cover of the cable box. Connect the AC cables to the
corresponding ports. Fix the cover back to the cable box, as Figure 32 shows.
Cable Box Earthing Point
Control Box Earthing Point
Figure 33 Earthing Points
Step 23: Figure 33 shows the earthing points on the HV50056 and cable box. Please
connect them to the grounding copper bar of the customer.
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 28 of 46