Alpha ESS Storion-SMILE-T10 Installation Manual page 25

Energy storage system
Hide thumbs Also See for Storion-SMILE-T10:
Table of Contents

Advertisement

Your Smart Energy
Installation
Battery power cable connection sequence:
Through the waterproof cap→through the sealing ring→through the joint, fixed to the
copper bar with M5 nut inside of the battery.
Figure 23 Power Cable Plug Connectors
HV50056 & Battery power cable connection sequence: one side terminal shall
through the waterproof cap→through the sealing ring→through the joint of the battery,
fixed to the copper bar with M5 nut inside of the battery; The plug connector on the
other side shall be connected to the plug port of the HV50056 with the corresponding
color. When a crisp sound is heard, the connection is correct.
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 23 of 46

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents