2. Connect port B on the link control card (LCC A) of the lower-numbered DAE to
port A on the link control card (LCC A) of the higher-numbered DAE.
LCC A is on the lower portion of the DAE.
3. Connect port B on the link control card (LCC B) of the lower-numbered DAE to
port A on the link control card (LCC B) of the higher-numbered DAE.
LCC B is on the upper portion of the DAE.
Example 1 Connect the DAE to another DAE
Figure 24 25-drive DAE extended to a 15-drive DAE
B
A
1
Procedure
1. Verify that the cabinet circuit breakers are in the On position and that power is
connected to the cabinet.
2. Connect the power cables to the optional DAEs.
Figure 25 Connecting power cables to the 3U, 15-drive DAE
1
B
A
x4
x4
0
B
0
0
0
1
1
x4
x4
x4
x4
2
A
B
1
A
CL5765
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Unity 680/fUnity 880/f

Table of Contents