GP7 periodic
maintenance
About
Moving parts typically have limited lifecycle and need to be replaced within specified intervals. By following
these intervals, the projector will maintain optimal performance.
The service components and their intervals are specified in the table below.
The GP7 Low Frequency Maintenance (LFM) schedule has 2 main service intervals: 20.000 hours and 40.000
hours.
Complete service kits are available for purchase.
The components listed in the 20.000 hour interval must be also exchanged during the 40.000 hour
interval service.
Both intervals should be performed by authorized service technicians in controlled environments,
typically in a service center.
6
723–0018 /02
F70
37