Assembly - ProMinent Makro TZ Operating Instructions Manual

Plunger metering pump
Table of Contents

Advertisement

6

Assembly

Install the motor - with designs without
motor
Base
h
P_MOZ_0016_SW
Fig. 7
Refer to the correct dimensional drawings on our
website www.prominent.com for assistance.
Compare the dimensions on the dimensional
drawing with those of the pump.
1.
Select a suitable motor - it must correspond to the data for one of
the motors from the "Motor data" table - see Chapter "Technical
data".
WARNING!
EX is relevant in areas at risk from explosion!
2.
Fit the motor correctly on the flange (qualified personnel).
Observe the coupling operating instructions!
WARNING!
EX is relevant in areas at risk from explosion!
With a claw coupling: The claw on the motor shaft must be fixed at
the correct height, see corresponding figure and table.
3.
As you have converted an "incomplete machine" into a complete
machine, you must perform a conformity assessment, risk assess‐
ment, issue an EC Declaration of Conformity, fit your own company
nameplate, ... .
4.
With ATEX pumps: additionally perform an ignition hazard assess‐
ment.
5.
Complete the pump documentation / operating instructions.
WARNING!
The pump can break through the base or slide off it
Ensure that the base is horizontal, flat and perma‐
nently load-bearing.
Capacity too low
Vibrations can disturb the liquid end valves.
Do not allow the base to vibrate.
Assembly
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Makro tzka

Table of Contents