Figure 3-12 Assembling support bases
Step 2 Pull the back-end handle out of the UPS, as shown in
Figure 3-13 Pulling the back-end handle
1.
2.
Step 3 Hold the front-end handle and back-end handle to place the UPS on support bases. Each UPS
requires two pairs of support bases, and the distance between the two pairs of support bases
must be 480 mm or more, as shown in
Issue 11 (2018-12-10)
Loosen the back-end handle screws anticlockwise.
Pull the handle out of the groove.
Copyright © Huawei Technologies Co., Ltd.
Figure
3-13.