To wire the SPT sensor to the controller

Partially cut, then bend and pull off the outer jacket of the Rnet cable(s). Do not nick the inner insulation.
1
Strip about .25 inch (.6 cm) of the inner insulation from each wire.
.25 in.
(.6 cm)
Wire each terminal on the sensor to the same terminal on the controller. See diagram below.
2
NOTE Carrier recommends that you use the following Rnet wiring scheme:
Connect this wire...
Red
Black
White
Green
Verify that the Rnet jumper is set to Rnet.
3
VVT Zone Controller
300 Vac, power limited
UL: NEC CL2P, or better
Outer Jacket
Inner insulation
To this terminal...
+12V
Rnet-
Rnet+
Gnd