Installation; Field-Supplied Hardware - Carrier VVT Zone Installation And Startup Manual

Hide thumbs Also See for VVT Zone:
Table of Contents

Advertisement

Installation

Installation
To install the VVT Zone Controller:
Mount the controller to the VVT box. (page 7)
1
Wire the controller for power. (page 8)
2
Set the controller's address. (page 9)
3
Wire the controller to the MS/TP network. (page 10)
4
Wire sensor(s) to the controller. (page 11)
5
Wire equipment to the controller's outputs. (page 21)
6

Field-supplied hardware

Each zone controller installation requires the following field-supplied components:
zone terminal unit
round or rectangular mounting bracket
space temperature sensor
supply air temperature sensor
4x2-in. electrical box
transformer— 24 Vac, 40 VA
two no. 10 x 1/2-in. sheet metal screws (to secure SAT sensor to duct)
two no. 6-32 x 5/8-in. screws (to mount space temperature sensor base to electrical box)
wiring
bushings (required when mounting SAT sensor in a duct 6-in. or less in diameter)
Optional:
contactors (if required for fan or electric heat)
indoor air quality sensor
relative humidity sensor
2 screws and 2 hollow wall anchors (to mount relative humidity sensor directly to wall)
valve and actuator for hot water heat (if required)
6
VVT Zone Controller

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Opn-vvtzc

Table of Contents