5
Select the Trace 1 Icon (
the Project Window.
(Check that the Trace 1 is
highlighted as shown in the
figure on the right.)
*Trace 1 corresponds to Port 1
of Serial Communications Unit.
6
Select Start Trace - One Shot
Trace from the PLC Menu.
7
Check that the status of Trace 1
in the Project Window changes
to One-shot Trace Running.
7.Serial Communications Connection Procedure
) in
39