VERSION 12/2015
OPERATING MANUAL
Safe operation of the EvoMotion pump is only guaranteed with a ground
connection.
Connect all ground cables using a short and direct route.
Procedure:
1. Ground the pump, connect the grounding cable to
potential equalization on-site.
2. Ground the product tank.
3. Ground the other parts of the system to an on-site
grounding connection. 16 mm2;
Ex zone
All devices and equipment must be suitable for use in
potentially explosive areas.
Tank
All paints, fl ushing agents and waste tanks have to be electrically conductive.
All tanks must be grounded.
Grounding cable
ORDER NUMBER DOC2333558
B_04127
30