Figure 5-11 Install Battery - Siemens SINAMICS GM150 Operating And Installation Instructions

Medium-voltage drive
Hide thumbs Also See for SINAMICS GM150:
Table of Contents

Advertisement

Installation
5.11 Installing the battery of the uninterruptible power supply
7. Insert the battery pack
8. To reinstall the uninterruptible power supply, perform steps 2 to 6 in reverse order.
9. Remove the "UPS without battery pack" label from the converter.
100
Figure 5-11
Install battery
.
SINAMICS GM150 6SL3815-2LN41-4AA2
Operating Instructions 04/2017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents