Delta M Series Operation And Installation Manual page 39

Hide thumbs Also See for M Series:
Table of Contents

Advertisement

A
L1 Terminal
N Terminal
B
C
L2 Terminal
Figure 31: Wiring box AC assembly – terminal labeling
NOTICE!
AVIS!
WARNING!
AVERTISSEMENT!
1.
Mount the AC disconnect (if required by local AHJ) close enough to the inverter.
2.
Install conduit fitting and conduit into the wiring box compartment from AC disconnect or
utility service panel.
3.
Thread the inverter's AC output wires through cup piece of conduit and loosely fit the
conduit into the inverter's open conduit fitting and the DC disconnect or junction box conduit
fitting.
4.
Route AC wiring through conduit and verify that the exposed wires are at least 6 inches
in length to provide adequate strain relief and wire end strip length required. Secure the
conduit into both fittings then tighten conduit fittings to manufacturer's recommended
torque.
PV PV PV PV PV PV BAT BAT
1+ 2+ 3+ 1- 2- 3- +
-
E
F
D
Ground
Ground
E
F
Ground
Stranded copper wire should be checked so that all strands go into
the terminal opening.
Il conviendra d'inspecter le fil de cuivre multi-filaire afin de
s'assurer que tous ses brins sont insérés dans l'alésage de la
borne.
AC disconnect may be required by your local AHJ. Please check
local regulations to determine if the AC disconnect is required for
your installation.
Une déconnexion du CA peut être requise par votre AHJ local.
Veuillez consulter les règlements locaux afin de déterminer si la
déconnexion du CA est requise pour votre installation.
B
A
C
L1 N L2
D
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M5-tl-usM4-tl-usM8-tl-usM6-tl-usM10-tl-us

Table of Contents