Enclosure Installation - IBM 9348 Service Information

Table of Contents

Advertisement

Enclosure Installation
Note:
This procedure applies to
the table-top unit only.
Align the rails of the tape unit with
the slots in the enclosure, and
then push the unit into the enclo-
sure until the plunger touches the
front of the enclosure.
Enclosure Cover
\
\
Plunger
Press the cover release latch, and
then open the enclosure cover.
Cover Release Latch
3-1 28
9348 Service 1
nformation

Advertisement

Table of Contents
loading

Table of Contents