IBM 9348 Service Information page 50

Table of Contents

Advertisement

Ensure that all connections to the
control panel power switch are
connected tightly.
Place the tape unit in the oper-
ating position; see "Placing the
9348 in the Operating Position" on
page 3-9.
Insert the CE test tape and run
sequence test 2; see "Running
Diagnostic Tests" on page A-5.
Does the problem continue to
occu
f?
Yes
No
1
This ends the procedure.
1-38
9348
Service Information

Advertisement

Table of Contents
loading

Table of Contents