IBM 9348 Service Information page 247

Table of Contents

Advertisement

This sequence is started by the interface controller at power on and checks all paths
and operation of the specific interface.
The sequence:
Diagnostic Test 17 (ServolMotor Drive Electronics Sequence)
A scratch tape is not needed for this test.
This sequence checks the operation of the servo and motor drive circuits. These
sequence tests are not interactive.
The sequence:
Diagnostic Test 18 (ServoIMotor Drive Checkout Sequence)
A scratch tape is needed for this test.
The sequence:
Diagnostic Test 19 (Buffer Hardware Sequence)
This sequence checks the data path and operation of the data buffer registers and
direct-access storage. It isolates any problems specific to the data buffer.
The sequence:
Appendix B. magnostic Tests
B-5

Advertisement

Table of Contents
loading

Table of Contents