Storage method Place the packaging (circuit-breakers and / or fixed parts) on a horizontal plane, not in contact
9 | © 2013 ABB | 1SDH001000R0002 - L7804
with the floor. If the circuit-breaker has been removed and reinserted in the package ensure,
prior to storage that:
• The circuit-breaker is in the open position and the springs are unloaded. See the chapter
"Description - circuit-breaker opening/closing operations" on page 15
• The circuit-breaker is protected and locked in its original packaging
WARNING! overlay up to three packages with circuit-breakers E2.2 and E4.2
and up to two packages with circuit-breakers E6.2. If the packaging has been
opened, you can stack the circuit-breakers on the condition that the package
is re-wrapped as original.
Figure 4
OK!
Figure 5
Emax E2.2-E4.2-E6.2 circuit-breakers | 2 - Transport and checking on receipt
ABB | SACE Emax 2
3
(E2.2 - E4.2)
2
(E6.2)
NO!