183 | © 2013 ABB | 1SDH001000R0002 - L7804
Continued from the previous page
The following table describes the programmable actions on the release:
Action
Trip RESET
Energy RESET
External Trip
Switch On LOCAL
Signalling RESET
YO Command
YC Command
Switch On SET B
Description
Reset of the opening signal.
Resetting the energy counters (see the chapter "15 - Measuring
Measurements", and the paragraph "Energy meters", on page
135).
Opening of the circuit-breaker.
Switching of the connection from remote to local (see the
chapter "6 - Menu", and the paragraph "Settings Menu", on
page 69).
Reset of the signals.
Tripping of the opening coil.
Tripping of the closing coil.
Switching the protections from configuration A to configuration
B (see the chapter "11 - Hi-Touch protections", and the
paragraph "Set A-B", on page 108).
ABB | SACE Emax 2
Electronic accessories | 4 - Ekip Signalling 4K module